Products

Factory Supplied Carbon Steel Zinc Plated YZP Concrete Knurled Drop in Anchors

Short Description:

FOB Price: US $0.5 – 9,999 / Piece
Min.Order: 1000pcs
Packaging: Bag/Box & Pallet
Port: Tianjin
Delivery: 5-30days Ather Receiving Depot


Product Detail

Product Tags

What is knurled drop in anchors?

Drop-In anchors are female concrete anchors designed for anchoring into concrete. Drop the anchor into the pre-drilled hole in the concrete. Using a setting tool expands the anchor within the hole in the concrete. Drop-in anchors require a setting tool to install. If you do not have a setting tool, be sure to purchase one.

Size

Knurled-Drop-in-Anchor
Drop-in-Anchor-Zinc-1

Applications

• Drop-In anchors should only be used in solid concrete.

• Their main use is to insert threaded rod to suspend electrical cable trays, HVAC ductwork and fire sprinkler pipe and heads.

• They can be used in applications that require a flush mounted anchor and when a bolt needs to be inserted and removed.

• A setting tool is required to set the anchor in the concrete.

application

Installation

• As with all female type anchors, the designated diameter of the Drop-In anchor refers to the side diameter of the anchor.

• The outside diameter of the anchor is equal to the hole diameter required to be drilled in the concrete.

• Minimum embedment for each diameter of Drop-In anchor is the length of the anchor.

• The Drop-In Anchor requires the bottom of the hole to set the anchor.

• First, drop the anchor in the hole with the threaded open end up towards the surface, then insert proper setting tool and hit with a hammer until the Drop-In anchor is fully set.

Product Parameters

Name Drop In Anchor
 Size M2-M24,or non-standard as request&design
 Material Stainless Steel, Carbon Steel,Brass, and So on
 Grade 4.8,8.8,10.9,12.9.etc
 Standard GB, DIN, ISO, ANSI/ASTM, BS, BSW, JIS etc
 Non-standards OEM is available, according to drawing or samples
 Finish Plain, black, zinc plated/according to your requirement
Delivery 20-30 days after received the deposit.
 Package According to customers require

Packaging and Shipment

factory-(8)
factory-(2)
factory-(1)
factory-(3)
factory-(6)
factory-(4)
factory-(7)
factory-(5)
packing

Our Market

major-market

Our Customers

customer-(1)
customer-(7)
customer-(5)
customer-(2)
customer-(4)
customer-(9)
customer-(3)
customer-(10)
customer-(8)

  • Previous:
  • Next:

  • Related Products